{"id":42100,"date":"2026-05-29T08:41:43","date_gmt":"2026-05-29T11:41:43","guid":{"rendered":"https:\/\/agenciainfra.com\/blog\/?p=42100"},"modified":"2026-05-29T11:36:47","modified_gmt":"2026-05-29T14:36:47","slug":"comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap","status":"publish","type":"post","link":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/","title":{"rendered":"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP"},"content":{"rendered":"\n<p class=\"has-text-align-right\"><strong>Marisa Wanzeller, da Ag\u00eancia iNFRA<\/strong><\/p>\n\n\n\n<p>A CPL (Comiss\u00e3o Permanente de Leil\u00f5es) da ANEEL (Ag\u00eancia Nacional de Energia El\u00e9trica) decidiu inabilitar <a href=\"https:\/\/www.in.gov.br\/web\/dou\/-\/despacho-n-1.945-de-28-de-maio-de-2026-709143140\">nove usinas<\/a> dos cons\u00f3rcios da EPP (Evolution Power Partners) que venceram o LRCAP (Leil\u00e3o de Reserva de Capacidade em forma de Pot\u00eancia) de 2026. Os empreendimentos somam 1,7 GW (gigawatts) e tinham entrega prevista para 2028 e 2029.<\/p>\n\n\n\n<p>O aviso foi publicado no DOU (Di\u00e1rio Oficial da Uni\u00e3o) nesta sexta-feira (29). Os empreendimentos inabilitados s\u00e3o: UTE Altos I, do cons\u00f3rcio ION I; UTE Teresina, do cons\u00f3rcio ION III; UTE Amarra\u00e7\u00e3o EPP, do cons\u00f3rcio ION III a; UTE Portinho BEP, do cons\u00f3rcio ION III b; UTE Sergipe V, do cons\u00f3rcio ION III b; UTE Aracati, do cons\u00f3rcio ION IV; UTE Porto Norte Fluminense II C, do cons\u00f3rcio ION II; UTE Porto Norte Fluminense I B, do cons\u00f3rcio ION II; e UTE Santa Clara, do cons\u00f3rcio ION IV.<\/p>\n\n\n\n<p>A CPL tamb\u00e9m inabilitou a <a href=\"https:\/\/www.in.gov.br\/web\/dou\/-\/despacho-n-1.944-de-28-de-maio-de-2026-709128844\">UTE Garuva<\/a>, da Termog SPE, de 88,2 MW (megawatts) com entrega prevista para 2029.<\/p>\n\n\n\n<p><strong>Cons\u00f3rcio ION<\/strong><br>Os cons\u00f3rcios ION I, ION II, ION III a, ION III b, ION IV, e ION V \u2013 analisados em nota t\u00e9cnica espec\u00edfica pela comiss\u00e3o \u2013 s\u00e3o integrados pela EPP e por empresas que possuem interdepend\u00eancia societ\u00e1ria entre elas. Tamb\u00e9m registra-se a entrada da J&amp;F no capital social da EPP ap\u00f3s a realiza\u00e7\u00e3o do leil\u00e3o, mas cujo patrim\u00f4nio n\u00e3o foi considerado para a habilita\u00e7\u00e3o por alterar substancialmente a situa\u00e7\u00e3o econ\u00f4mico-financeira dos cons\u00f3rcios. O grupo dos irm\u00e3os Batista ainda negocia a compra de 30% da EPP. Segundo fontes, a transa\u00e7\u00e3o ainda n\u00e3o foi conclu\u00edda.<\/p>\n\n\n\n<p>Em <a href=\"https:\/\/sei.aneel.gov.br\/sei\/modulos\/pesquisa\/md_pesq_documento_consulta_externa.php?yPDszXhdoNcWQHJaQlHJmJIqCNXRK_Sh2SMdn1U-tzMgWKMpUnCKUekl5fs4GBcTn7esH92GiY72GULaiyR2C3AyJpJ5ipruc4TCvBGszmupl70BPd52sLjCaRzCnkIc\">nota t\u00e9cnica<\/a>, a comiss\u00e3o de leil\u00f5es aponta que o patrim\u00f4nio l\u00edquido da EPP de 2025 ficou em R$ 53,2 milh\u00f5es, pouco acima do m\u00ednimo exigido pelo edital do leil\u00e3o, de R$ 52,7 (10% do total dos investimentos declarados somados todos os projetos vencedores da proponente). Contudo, o agente n\u00e3o apresentou documento que ateste o aumento expressivo de 871% registrado no ativo, 871% no passivo e 426% no patrim\u00f4nio l\u00edquido da companhia no \u00faltimo trimestre de 2025 em rela\u00e7\u00e3o ao exerc\u00edcio de 2024.<\/p>\n\n\n\n<p>&#8220;Esses aumentos ocorridos no ativo e, principalmente, do patrim\u00f4nio l\u00edquido ganham relev\u00e2ncia particular no processo de habilita\u00e7\u00e3o em curso, necessitando que essas opera\u00e7\u00f5es indicadas no balan\u00e7o patrimonial sejam materialmente justificadas, o que n\u00e3o ocorreu adequadamente&#8221;, dizem os t\u00e9cnicos da CPL.<\/p>\n\n\n\n<p>O mesmo ocorre com a BEP (Brazilian Energy Participa\u00e7\u00f5es). Nesse caso, a CPL ainda aponta que cerca de R$ 26 milh\u00f5es do patrim\u00f4nio l\u00edquido de R$ 237 milh\u00f5es registrado pela empresa \u00e9 origin\u00e1rio, por equival\u00eancia patrimonial, da EPP. Assim, \u201cse retirasse do patrim\u00f4nio l\u00edquido da BEP o resultado oriundo da EPP, a BEP n\u00e3o alcan\u00e7aria o patrim\u00f4nio m\u00ednimo exigido no edital&#8221;, de R$ 216,7 milh\u00f5es.<\/p>\n\n\n\n<p>Para OAK Participa\u00e7\u00e3o, tamb\u00e9m relevante nos cons\u00f3rcios, era preciso a comprova\u00e7\u00e3o de patrim\u00f4nio l\u00edquido m\u00ednimo de R$ 79,4 milh\u00f5es. A CPL apontou que foi verificada rubrica equival\u00eancia patrimonial no valor de R$ 56,4 milh\u00f5es, que corresponde a 50% do resultado do exerc\u00edcio da EPP.<\/p>\n\n\n\n<p>A equival\u00eancia patrimonial tamb\u00e9m \u00e9 registrada na consorciada Princess Solutions e Participa\u00e7\u00f5es, empresa em que a BEP possui 55,63% de participa\u00e7\u00e3o e que integrou os cons\u00f3rcios IV e ION V a; e pela MAGPar, que integrou os cons\u00f3rcios ION III, ION III b, ION IV e ION V.<\/p>\n\n\n\n<p><strong>Altera\u00e7\u00e3o societ\u00e1ria<\/strong><br>Em 21 de maio a EPP comunicou reestrutura\u00e7\u00e3o societ\u00e1ria \u00e0 ANEEL. A empresa, que participa de todos os cons\u00f3rcios, registrou a entrada de outro acionista \u2013 com 30% no capital social \u2013 e com a consequente redu\u00e7\u00e3o de participa\u00e7\u00e3o dos demais acionistas.<\/p>\n\n\n\n<p>A CPL aponta que essa altera\u00e7\u00e3o societ\u00e1ria teria, segundo a empresa, o potencial de superar quest\u00f5es relativas aos requisitos de habilita\u00e7\u00e3o econ\u00f4mico-financeira de algumas empresas consorciadas. Contudo, o <a href=\"https:\/\/agenciainfra.com\/blog\/jf-nao-garante-viabilidade-da-epp-no-lrcap-diz-procuradoria-da-aneel\/\">parecer jur\u00eddico<\/a> apresentado pela procuradoria federal junto \u00e0 ANEEL na quarta-feira (28) diz que, caso a entrada do novo s\u00f3cio (a J&amp;F, grupo dos irm\u00e3os Batista) alterasse substancialmente a qualifica\u00e7\u00e3o econ\u00f4mico-financeira dos cons\u00f3rcios, os novos documentos apresentados para habilita\u00e7\u00e3o das usinas n\u00e3o poderiam ser aceitos.<\/p>\n\n\n\n<p>Assim, a comiss\u00e3o decidiu n\u00e3o se basear nessa reestrutura\u00e7\u00e3o societ\u00e1ria da EPP para fins de habilita\u00e7\u00e3o das proponentes, \u201ctendo em vista que a entrada de um novo acionista modifica as condi\u00e7\u00f5es de habilita\u00e7\u00e3o econ\u00f4mico-financeira tanto da EPP, como da BEP e da OAK Participa\u00e7\u00f5es&#8221;.<\/p>\n\n\n\n<p>Segundo fontes pr\u00f3ximas \u00e0 empresa, a notifica\u00e7\u00e3o da inten\u00e7\u00e3o de altera\u00e7\u00e3o societ\u00e1ria \u00e9 obrigat\u00f3ria e a carta busca demonstrar que a entrada da J&amp;F n\u00e3o enfraqueceria a solidez do neg\u00f3cio. De acordo com interlocutores, a \u00eanfase na carta n\u00e3o diz respeito a uma eventual necessidade de que a companhia entre para viabilizar os projetos, mas apenas \u00e0 garantia de manuten\u00e7\u00e3o da robustez dos neg\u00f3cios. Isso porque a CPL precisaria aprovar previamente a altera\u00e7\u00e3o do cons\u00f3rcio, para garantir que &#8220;n\u00e3o se simule um cons\u00f3rcio robusto que depois \u00e9 transferido para acionistas sem capacidade&#8221;, diz um interlocutor.<\/p>\n\n\n\n<p><em>*Texto atualizado \u00e0s 10h40 da sexta-feira (29) com novas informa\u00e7\u00f5es.<\/em><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Marisa Wanzeller, da Ag\u00eancia iNFRA A CPL (Comiss\u00e3o Permanente de Leil\u00f5es) da ANEEL (Ag\u00eancia Nacional de Energia El\u00e9trica) decidiu inabilitar nove usinas dos cons\u00f3rcios da EPP (Evolution Power Partners) que venceram o LRCAP (Leil\u00e3o de Reserva de Capacidade em forma de Pot\u00eancia) de 2026. Os empreendimentos somam 1,7 GW (gigawatts) e tinham entrega prevista para [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39539,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[7250],"tags":[20137,20149,4912,9822,7366,54,20147],"class_list":["post-42100","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-destaque-lista","tag-epp","tag-inabilitadas-no-lrcap","tag-leilao-de-energia","tag-lrcap","tag-marisa-wanzeller","tag-setor-eletrico","tag-ute-garuva"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.4 (Yoast SEO v26.0) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP - Ag\u00eancia iNFRA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP\" \/>\n<meta property=\"og:description\" content=\"Marisa Wanzeller, da Ag\u00eancia iNFRA A CPL (Comiss\u00e3o Permanente de Leil\u00f5es) da ANEEL (Ag\u00eancia Nacional de Energia El\u00e9trica) decidiu inabilitar nove usinas dos cons\u00f3rcios da EPP (Evolution Power Partners) que venceram o LRCAP (Leil\u00e3o de Reserva de Capacidade em forma de Pot\u00eancia) de 2026. Os empreendimentos somam 1,7 GW (gigawatts) e tinham entrega prevista para [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/\" \/>\n<meta property=\"og:site_name\" content=\"Ag\u00eancia iNFRA\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ageninfra\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-29T11:41:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-29T14:36:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"826\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Ag\u00eancia iNFRA\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@agencia_infra\" \/>\n<meta name=\"twitter:site\" content=\"@agencia_infra\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ag\u00eancia iNFRA\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/\"},\"author\":{\"name\":\"Ag\u00eancia iNFRA\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/#\/schema\/person\/34af08dff6adea4cb22b06612ba7acfa\"},\"headline\":\"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP\",\"datePublished\":\"2026-05-29T11:41:43+00:00\",\"dateModified\":\"2026-05-29T14:36:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/\"},\"wordCount\":927,\"publisher\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png\",\"keywords\":[\"EPP\",\"Inabilitadas no LRCAP\",\"leil\u00e3o de energia\",\"LRCAP\",\"Marisa Wanzeller\",\"Setor El\u00e9trico\",\"UTE Garuva\"],\"articleSection\":[\"Destaque lista\"],\"inLanguage\":\"pt-BR\",\"copyrightYear\":\"2026\",\"copyrightHolder\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/\",\"url\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/\",\"name\":\"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP - Ag\u00eancia iNFRA\",\"isPartOf\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png\",\"datePublished\":\"2026-05-29T11:41:43+00:00\",\"dateModified\":\"2026-05-29T14:36:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#primaryimage\",\"url\":\"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png\",\"contentUrl\":\"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png\",\"width\":1280,\"height\":826,\"caption\":\"Foto: ANEEL\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/agenciainfra.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/#website\",\"url\":\"https:\/\/agenciainfra.com\/blog\/\",\"name\":\"Ag\u00eancia iNFRA\",\"description\":\"Multiplataforma de informa\u00e7\u00e3o jornal\u00edstica refer\u00eancia na \u00e1rea de infraestrutura no Brasil!\",\"publisher\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/agenciainfra.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/#organization\",\"name\":\"Ag\u00eancia iNFRA\",\"url\":\"https:\/\/agenciainfra.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2023\/09\/iNFRA_5-e1761735885940.png\",\"contentUrl\":\"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2023\/09\/iNFRA_5-e1761735885940.png\",\"width\":1672,\"height\":454,\"caption\":\"Ag\u00eancia iNFRA\"},\"image\":{\"@id\":\"https:\/\/agenciainfra.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/ageninfra\",\"https:\/\/x.com\/agencia_infra\",\"https:\/\/www.linkedin.com\/company\/ag\u00eanciainfra\/\",\"https:\/\/www.instagram.com\/agenciainfra\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/#\/schema\/person\/34af08dff6adea4cb22b06612ba7acfa\",\"name\":\"Ag\u00eancia iNFRA\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\/\/agenciainfra.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d189e01678f06d8eb84d4e01f08eb848b3fffe3f8443818d3c356c66892f5be8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d189e01678f06d8eb84d4e01f08eb848b3fffe3f8443818d3c356c66892f5be8?s=96&d=mm&r=g\",\"caption\":\"Ag\u00eancia iNFRA\"},\"url\":\"https:\/\/agenciainfra.com\/blog\/author\/admin\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP - Ag\u00eancia iNFRA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/","og_locale":"pt_BR","og_type":"article","og_title":"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP","og_description":"Marisa Wanzeller, da Ag\u00eancia iNFRA A CPL (Comiss\u00e3o Permanente de Leil\u00f5es) da ANEEL (Ag\u00eancia Nacional de Energia El\u00e9trica) decidiu inabilitar nove usinas dos cons\u00f3rcios da EPP (Evolution Power Partners) que venceram o LRCAP (Leil\u00e3o de Reserva de Capacidade em forma de Pot\u00eancia) de 2026. Os empreendimentos somam 1,7 GW (gigawatts) e tinham entrega prevista para [&hellip;]","og_url":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/","og_site_name":"Ag\u00eancia iNFRA","article_publisher":"https:\/\/www.facebook.com\/ageninfra","article_published_time":"2026-05-29T11:41:43+00:00","article_modified_time":"2026-05-29T14:36:47+00:00","og_image":[{"width":1280,"height":826,"url":"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png","type":"image\/png"}],"author":"Ag\u00eancia iNFRA","twitter_card":"summary_large_image","twitter_creator":"@agencia_infra","twitter_site":"@agencia_infra","twitter_misc":{"Escrito por":"Ag\u00eancia iNFRA","Est. tempo de leitura":"5 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#article","isPartOf":{"@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/"},"author":{"name":"Ag\u00eancia iNFRA","@id":"https:\/\/agenciainfra.com\/blog\/#\/schema\/person\/34af08dff6adea4cb22b06612ba7acfa"},"headline":"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP","datePublished":"2026-05-29T11:41:43+00:00","dateModified":"2026-05-29T14:36:47+00:00","mainEntityOfPage":{"@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/"},"wordCount":927,"publisher":{"@id":"https:\/\/agenciainfra.com\/blog\/#organization"},"image":{"@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#primaryimage"},"thumbnailUrl":"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png","keywords":["EPP","Inabilitadas no LRCAP","leil\u00e3o de energia","LRCAP","Marisa Wanzeller","Setor El\u00e9trico","UTE Garuva"],"articleSection":["Destaque lista"],"inLanguage":"pt-BR","copyrightYear":"2026","copyrightHolder":{"@id":"https:\/\/agenciainfra.com\/blog\/#organization"}},{"@type":"WebPage","@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/","url":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/","name":"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP - Ag\u00eancia iNFRA","isPartOf":{"@id":"https:\/\/agenciainfra.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#primaryimage"},"image":{"@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#primaryimage"},"thumbnailUrl":"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png","datePublished":"2026-05-29T11:41:43+00:00","dateModified":"2026-05-29T14:36:47+00:00","breadcrumb":{"@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#primaryimage","url":"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png","contentUrl":"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2026\/04\/aneel-fachada-foto-aneel.png","width":1280,"height":826,"caption":"Foto: ANEEL"},{"@type":"BreadcrumbList","@id":"https:\/\/agenciainfra.com\/blog\/comissao-de-leiloes-da-aneel-inabilita-usinas-da-epp-que-venceram-lrcap\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/agenciainfra.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Comiss\u00e3o de Leil\u00f5es da ANEEL inabilita usinas da EPP que venceram LRCAP"}]},{"@type":"WebSite","@id":"https:\/\/agenciainfra.com\/blog\/#website","url":"https:\/\/agenciainfra.com\/blog\/","name":"Ag\u00eancia iNFRA","description":"Multiplataforma de informa\u00e7\u00e3o jornal\u00edstica refer\u00eancia na \u00e1rea de infraestrutura no Brasil!","publisher":{"@id":"https:\/\/agenciainfra.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/agenciainfra.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Organization","@id":"https:\/\/agenciainfra.com\/blog\/#organization","name":"Ag\u00eancia iNFRA","url":"https:\/\/agenciainfra.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/agenciainfra.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2023\/09\/iNFRA_5-e1761735885940.png","contentUrl":"https:\/\/agenciainfra.com\/blog\/wp-content\/uploads\/2023\/09\/iNFRA_5-e1761735885940.png","width":1672,"height":454,"caption":"Ag\u00eancia iNFRA"},"image":{"@id":"https:\/\/agenciainfra.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ageninfra","https:\/\/x.com\/agencia_infra","https:\/\/www.linkedin.com\/company\/ag\u00eanciainfra\/","https:\/\/www.instagram.com\/agenciainfra\/"]},{"@type":"Person","@id":"https:\/\/agenciainfra.com\/blog\/#\/schema\/person\/34af08dff6adea4cb22b06612ba7acfa","name":"Ag\u00eancia iNFRA","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/agenciainfra.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d189e01678f06d8eb84d4e01f08eb848b3fffe3f8443818d3c356c66892f5be8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d189e01678f06d8eb84d4e01f08eb848b3fffe3f8443818d3c356c66892f5be8?s=96&d=mm&r=g","caption":"Ag\u00eancia iNFRA"},"url":"https:\/\/agenciainfra.com\/blog\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/posts\/42100","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/comments?post=42100"}],"version-history":[{"count":5,"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/posts\/42100\/revisions"}],"predecessor-version":[{"id":42118,"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/posts\/42100\/revisions\/42118"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/media\/39539"}],"wp:attachment":[{"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/media?parent=42100"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/categories?post=42100"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/agenciainfra.com\/blog\/wp-json\/wp\/v2\/tags?post=42100"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}